Building Services Division


Introduction

Building Services Division was incorporated in 2013 as part of the company plan to venture into construction business. Our vision is to grow into an established Building Services contractor and products supplier in the near future.


Project

Shriro (Singapore) Pte Ltd was registered as a BCA registered contractor in the work head ME01 (Air-Conditioning, Refrigeration & Ventilation Works) at Grade L1 in January 2013.We had assembled an experience and professional team in the field of Mechanical Works primarilyAir-Conditioning and Mechanical Ventilation system. The sectors that we had endeavour into are,

  • 1. Research
  • 2. Commercial
  • 3. Logistic & Warehousing
  • 4. Infrastructure and Transport

Below are some of our project references:

S/No Project Client Type of Works Type of Contract Year
1 M1-Regional Operation Centre M1 AC system for server room Direct to M1 2013
2 Combined Services Tunnel 3B MC01 & MC02 at Downtown Marina Bay Voltas Limited MV system for underground tunnel Direct Sub-Con of Voltas 2013-2014
3 Institute of Molecular and Cell Biology @ Proteos Level 8 and Roof i-Lab Engineering Pte Ltd Design, built and relocation works of ACMV system for office and laboratory Direct Sub-Con of i-Lab 2013
4 Biopolis Shared Facilities (BSF) Basement 2 i-Lab Engineering Pte Ltd Design, built and relocation works of ACMV system for laboratory Direct Sub-Con of i-Lab 2013
5 Solar Energy Research Institute of Singapore (SERIS) @ Cleantech One Dai-Dan Co., Ltd ACMV System for office and laboratory Direct Sub-Con of Dai-Dan 2013-2014
6 Kian Ann Warehouse OTH Construction & Engineering (S) Pte Ltd Engineering Smoke Control System, Sprinkler Fire Protection & ACMV system for warehouse Direct Sub-Con of OTH 2013-2014
7 Siemen (Health Care) PDM Iinternational Supply and Install of Ducting Works Direct Sub-Con of PDM 2014
8 SRC Mogas Cogen @ Jurong Island Dai-Dan Co., Ltd Supply & Install of ACMV System, Gas Detector & ACMV Equipments for 22kV Intake Substation, SS06 Substation, COGEN Field Center Direct Sub-Con of Dai-Dan 2014-2015
9 Solar Energy Research Institute of Singapore (SERIS) @ NUS Block E3A i-Lab Engineeering Pte Ltd Design, built and relocation works of ACMV system for office, cleanroom & laboratories. Direct Sub-Con of i-Lab 2014-2015
10 Siemen (Health Care) - Phase 3 PDM Iinternational Supply and Install of Ducting Works Direct Sub-Con of PDM 2015
11 HBA Singapore office @ Kim Yan Road HBA Supply and Install of Fire Protection Works (Smoke & heat detectors) Direct Sub-Con of HBA 2014
12 SIKA Asia Pacific PDM Iinternational Supply and Install of Ducting Works Direct Sub-Con of PDM 2014
13 System on Silicon Manufacturing Co. Pte Ltd (SSMC) Warehouse Conversion Envipure Pte Ltd Supply and Install of Ducting Works Direct Sub-Con of Envipure 2015
14 Solar Energy Research Institute of Singapore ( SERIS ) @ NUS Block E3A i-Lab Engineeering Pte Ltd Supply and install Ducting Works to hook up SERIS equipment Direct Sub-Con of i-Lab 2015-2016
15 Solar Energy Research Institute of Singapore ( SERIS ) @ NUS Block E3A SERIS Supply and Install of Process Cooling Water System Direct Sub-Con of SERIS 2015-2016
16 Supply and installation of operation theatres, procedure rooms and integrated M&E systems for proposed development of an integrated regional hospital, community hospital and specialist outpatient clinics on lot 02019N PT MK21 at SengKang East Way/ SengKang East Road/ Anchorvale Street (SengKAng Planning Area), Singapore ("Sub-Contract works") i-Lab Engineeering Pte Ltd Supply and Install of ACMV works, Electrical works and BMS works for Operating Theatres @ Seng Kang Hospital Direct Sub-Con of i-Lab 2015-2018

We had attained the Bizsafe Level 3 certification in August 2013 and attached is the certification.